台灣 × 越南兩地服務|經紀業:家澤不動產經紀有限公司 Tiếng Việt 简体中文 會員註冊/登入 房東登入 室內設計 YouTube 影音 Facebook Zalo 微信 WeChat
新聞與市場資訊

Construction of Thu Thiem 2 bridge connecting District 1 and District 2 - Vinhomes Golden River benefits越南文

發布日期

Construction of Thu Thiem 2 bridge connecting District 1 and District 2 - Vinhomes Golden River benefits

Invested nearly 3,100 billion VND, Thu Thiem 2 bridge is nearly 1.5 km long with 6 lanes and is expected to be a prominent architectural highlight on the Saigon River.

Invested nearly 3,100 billion VND, Thu Thiem 2 bridge is nearly 1.5 km long with 6 lanes and is expected to be a prominent architectural highlight on the Saigon River. In particular, when completed, Thu Thiem 2 Bridge will have a positive impact on the real estate market in the area where it passes through.

With groundbreaking infrastructure and complete planning, District 2 is becoming an attractive destination for many investors. In addition to metro projects and key intersections, bridge projects are also heavily invested in to partly solve traffic congestion and change the appearance of the urban area. The construction of bridges named Thu Thiem connecting District 2 with inner-city districts not only helps change the appearance of the new urban area in District 2 but is also a happy signal to increase the value of real estate in the area in which it is located. via.

Typical Thu Thiem bridge projects include:

  • Thu Thiem 2 Bridge connects District 2 with District 1
  • Thu Thiem Bridge 3 connects District 2 with District 4
  • Thu Thiem Bridge 4 connects District 2 and District 7.

原文圖片:blog.rever.vn

Location of Thu Thiem bridge 2,3,4

Thu Thiem 2 bridge construction project

Thu Thiem 2 Bridge is an investment project of Dai Quang Minh Real Estate Investment Joint Stock Company, groundbreaking for construction on February 3, 2015, expected to be completed and put into operation on April 30. year 2018. 

Scale : The bridge has 6 lanes (4 car lanes and 2 general traffic lanes), with a total length of 1,465m, of which the bridge part is 885.7m long, designed as a cable-stayed bridge with towers. 113m high, leaning towards Thu Thiem, is the symbol of the welcome gate from the City Center to Thu Thiem New Urban Area . Along with the artistic lighting design, Thu Thiem 2 Bridge will be a prominent architectural highlight on the Saigon River both day and night.

原文圖片:blog.rever.vn
District 1 real estate received many good signals from the Thu Thiem 2 bridge construction project connecting District 1 and District 2

Route : Thu Thiem 2 Bridge has its starting point at the intersection of Ton Duc Thang - Le Duan, District 1, runs along Ton Duc Thang Street, crosses the Saigon River and connects with Vong Arc Avenue (Route R1) in the Urban Area. New town Thu Thiem, District 2.

The bridge leading to District 1 includes:

  • The main branch is 437m long with 4 lanes going straight past the Nguyen Huu Canh - Le Thanh Ton intersection, and connecting to the Le Duan - Ton Duc Thang intersection.
     
  • Branch N2 is 192.7m long, connecting from District 2 to District 1, landing on Ton Duc Thang street before the Nguyen Huu Canh - Le Thanh Ton intersection.
     
  • Branch N1 is 195.5m long, starting from Me Linh Square, running along Ton Duc Thang Street, following the Saigon River, connecting to the Main Bridge, passing through Thu Thiem New Urban Area.
     
  • The path leading to District 2 is 140 m long, connecting to Arc Avenue in Thu Thiem New Urban Area, and the soft ground is thoroughly treated with load-reducing floor methods and cement-reinforced soil pillars.

Investment costs : The project has a total investment of VND 4,260 billion, of which construction and consulting costs are VND 2,283 billion, technical infrastructure relocation and clearance compensation are VND 308.5 billion, and contingency The volume and provision for changes in salary are 491 billion VND and the cost of provisions for price inflation and loan interest is 1,180 billion VND.
 

Good signal for District 1 real estate

If Thu Thiem 4 Bridge is a symbol of District 7's future connection, Thu Thiem 2 Bridge symbolizes the harmony between a developed central urban area and a new urban area that is being shaped and will become a new urban area. The largest and most modern metropolis in Southeast Asia. The birth of Thu Thiem 2 Bridge along with Thu Thiem 4 Bridge and the Saigon River Crossing Tunnel not only contributes to reducing traffic pressure through the existing overloaded Saigon Bridge, perfecting the city's main transportation network. city, connecting the city center with the modern Thu Thiem New Urban Area.

On the other hand, when Thu Thiem Bridge 2 is completed, it will quickly connect District 1 with 4 main roads in the under-construction Thu Thiem New Urban Area, helping to raise the value of real estate in the area it passes through to new heights. , including: Vinhomes Golden River (located right at Ba Son port), Vinhomes Central Park , Sala Dai Quang Minh urban area , Empire City ,...

原文圖片:blog.rever.vn
Vinhomes Golden River is one of the projects benefiting from the Thu Thiem 2 bridge project

Located right on a prime piece of land in the center of District 1, limited by 2 streets Ton Duc Thang and Nguyen Huu Canh, near the intersection of Thu Thiem 2 bridge, it can be affirmed that Vinhomes Golden River is one of the projects has the potential to increase prices in the future, reaching 30-40% within the next 3 years.

Vinhomes Golden River Ba Son is the only project located between the two bridges Thu Thiem 1 and Thu Thiem 2, also a project connecting the old administrative center of District 1 with the new administrative center of Thu Thiem, District 2 of Saigon. , convenient for connecting traffic by road, rail and waterway. In the future, residents living here can move to the surrounding area quickly. 

LINE 免費諮詢 Zalo 加好友 微信

Zalo 加好友

Zalo QR Code Binh Phong +886 956 918 888

Binh Phong

+886 956 918 888

用 Zalo 掃描 QR Code,或在 Zalo 搜尋上面的電話號碼加好友

在手機上直接開啟 Zalo

微信 WeChat 加好友

微信 WeChat QR Code mr. phong 秉豐

mr. phong 秉豐

打開微信 →「掃一掃」掃描 QR Code 加好友;手機上可以先截圖,再從微信掃一掃選相簿