The Gió Riverside Khu dân cư Ngãi Thắng - The Gió Riverside
Pre-sale ongoing|Construction Department has approved sale of off-plan units

AI summary (based only on sources listed on this page, no speculation added)
The Gió Riverside is located at the confluence of the Đồng Nai River and the Ngọc River in Đông Hòa Ward, Di An City, former Binh Duong Province, developed by an An Gia subsidiary, consisting of 2 towers of 40-story apartments.
In the Ho Chi Minh City Department of Construction's data on pre-sale permits for January–July 2026, this project had the highest number of units at 2,905.
The project's first sales were launched in 2025, and in August 2026 the developer released the final batch of about 50 units.
Want to be notified when units in this project become available? Or get a project summary PDF?
Clicking the button below will open the LINE official account @ymq0321f with a pre-filled message; just press "Send".
Project basic information
| Pre-sale approval | In the Ho Chi Minh City Department of Construction's data on pre-sale permits for January–July 2026, this project (Khu dân cư Ngãi Thắng) had the highest number of apartment units at 2,905 [1] Tiền Phong reported that the Ho Chi Minh City Department of Construction's 2026 pre-sale permit list included this project [2] |
| Developer | Công ty TNHH Xây dựng Kinh doanh Dịch vụ Thương mại Đông Nam (An Gia subsidiary) [1] |
| Location | Đông Hòa Ward, at the confluence of the Đồng Nai River and the Ngọc River [3] Fronting ĐT16 Road, Bình An Ward, old Dĩ An City (2024 construction report wrote Bình Thắng Ward) [4] |
| Site area | Approximately 2.9 hectares (VnEconomy 2025-11 wrote approximately 3 hectares) [5] |
| Number of towers and floors | 2 towers, 40 floors [3] 2 residential towers, 40 floors above ground and 3 basements; total floor area approximately 297,000 m² [5] |
| Total units | The entire project has nearly 3,000 products; the permit list includes 2,905 apartment units [3] |
| Product type | Apartments plus shophouses (totaling nearly 2,900 units); the area also includes a 5-story school building [4] |
| Sales launch | First sales launched in 2025 [6] Limited units were released at the Gió Đông tower on May 11, 2026 [7] Launched to the market in March 2025 [4] |
| Ownership status | In 2022, the 1/500 detailed planning and land handover decision were completed, and the construction permit was obtained [5] |
| Key amenities | Infinity pool, Zen garden, BBQ area, outdoor sports field, children's play area, clubhouse; the project includes a K-12 school on a 7,000 m² campus [4] |
| Transportation | Adjacent to the Tân Vạn interchange, Hanoi Highway, Ring Road 3, and the Biên Hòa–Vũng Tàu expressway; near stations S0 and S2.1 of Metro Line 1's extension to Long Thành Airport (as stated by the developer) [3] |
| Construction contractor | Ricons (Công ty CP Đầu tư xây dựng Ricons) as the general contractor [5] |
| Partners | VPBank provides four-year construction financing to the developer and offers home loan packages [5] |
| Construction progress | Construction started by An Gia in June 2024 (reported on 2024-06-27) [5] |
| Recent news | In August 2026, the developer released the final batch of about 50 units [3] |
| Past disputes | At the Department of Construction's press conference in December 2025, the project had not yet received its pre-sale permit notice; it was only added to the permit list in 2026 [8] |
| New administrative district | phường Đông Hòa (the district was abolished as of 2025-07-01; addresses and property documents follow the new ward name) |
No primary source found yet, so not listed: handover, foreign purchase.
What foreigners should check before buying this project
- Foreign individuals can only buy commercial housing units in residential development projects; foreigners can own up to 30% of the total units in a building. Transactions exceeding this quota have no legal effect.Regulation explanation
- Foreign individuals' residential ownership lasts up to 50 years from the date the certificate is issued, extendable once for another 50 years.Regulation explanation
- Before buying, please check the status of the unit's certificate (Pink Book) and whether the foreigner quota for that building still has availability.Certificate explanation|How to check the quota
Sources
- Tuổi Trẻ:https://tuoitre.vn/nguon-cung-nha-o-tphcm-bung-no-voi-hon-21000-can-du-dieu-kien-mo-ban-100260724215707045.htm
- Tiền Phong:https://tienphong.vn/loat-du-an-bat-dong-san-tphcm-du-dieu-kien-mo-ban-post1862510.tpo
- VnExpress:https://vnexpress.net/can-ho-huong-song-the-gio-riverside-mien-vat-hoan-thien-kem-dien-may-5106565.html
- VnEconomy:https://vneconomy.vn/the-gio-riverside-dinh-hinh-chuan-song-moi-song-xanh-ben-song-gan-pho-thi.htm
- The Leader:https://theleader.vn/an-gia-khoi-cong-du-an-3000-can-ho-o-binh-duong-d4092.html
- Dân trí:https://dantri.com.vn/bat-dong-san/gia-can-ho-quanh-tphcm-tang-manh-sau-giai-doan-sap-nhap-20260306064854456.htm
- Dân trí:https://dantri.com.vn/bat-dong-san/the-gio-riverside-mo-ban-gio-hang-gioi-han-tai-thap-gio-dong-20260509122719974.htm
- The Leader:https://theleader.vn/tphcm-4-du-an-nha-o-chua-du-dieu-kien-ban-nha-hinh-thanh-trong-tuong-lai-d43657.html
Source retrieval date 2026-11-09. Project information is subject to the developer's announcements, the property disclosure statement and the sale and purchase contract.
Author: Denny Yang (Yang Bing-Feng) | FTT Land Consultant
Brokerage: 家澤不動產經紀有限公司 (Taiwan brokerage)|Signing broker for this advertisement: 陳宜君 (broker license no. (109)金縣字第000057號)
Overseas real estate investment carries risks. Investors are advised to read the marketing materials carefully and consider thoroughly before transacting.
This page is a compilation of public project information and is not individual investment advice; case-specific terms are subject to the property disclosure statement and the sale and purchase contract. Data as of 2026-11-09.
This page was compiled and reviewed by the FTT consulting team, with summaries assisted by AI tools.